the following projects require access to the tunnel:
-installation of the active grid. -installation of the linear motor and sled. (Lambertz) 3-6 weeks, start: end of november -installation of the camera systems. (Dr. Xi) -installation of the laser system. -installation of the new floor. (Dr. Xi) ? weeks, start: after the installation of the motor -performance of passive grid turbulence measurements. 4 weeks, start begin of november -installation of the new ceiling -installation of the laser positioning system (Lambertz) 1-2 days, parallel with the installation of the linear motor -installation of the wires for the motor (Lambertz) 1 week, parallel with the installation of the linear motor -installation of the wires for the aktive grid
-fix the design of the sled
- pressure tubes (Dr. Xi) - holding system for the mirrors (Dr. Xi)
time schedule
-week 44: installation of the end -week 45-48 (2/11/2009 - 29/11/2009) : experiment, Dr. Bewley -week 49- 52 (1/12/2009 - 23/12/2009 : installation of the linear motor (Schminke, Lambertz) -week 53 (24/12/2009 - 4/1/2010) -week 1-3 (5/1/2010 - 24/1/2010): installation of the linear motor (Schminke, Lambertz)